Open Projects

While this list is meant to be a general guide of what’s high priority at the space, I realize that this list might not be complete due to the realities of the space. If you feel like I’m missing or I’ve misstated what needs to be taken care of, please leave a comment on this page or send me a message on Talk (username: garfield) or an email: (ianwilson@dmsemail).

  • Tint windows in Purple Classroom
  • RTU 7’s Evap Condensation Drain is leaking in sewing, and there’s no power to RTU.
  • re-adhere the rubber molding (June/July/August time frame – after it’s been painted by CA)
  • Shelving needs to be placed under sink
  • North Lobby North Restroom needs the fixtures on the sinks re-tightened.
  • Move light from dark room to Women’s Restroom for more light in the stalls
  • Ceiling tiles need to be replaced from where there was water damage from the condenser/slop room leak
  • Drywall needs to be replaced where the paper towel holder is
  • Ceiling tiles need to be replaced from water damage
  • Emergency lights are needed in Sewing Room
  • Tesla Charger no longer working – Replacement cable/head cost is $175, replacement unit cost is $475. Cables are there, DMS can probably self-install both.